Dubai Electricity and Water Authority (DEWA) has announced that the Hatta pumped-storage hydroelectric power plant will begin gradually exporting clean energy to Dubai from April 2025, for the first time in the region. The project, which is currently 96.82% complete, is regarded as the first pumped-storage hydroelectric power plant in the Gulf region and will play an important role in strengthening sustainable energy infrastructure in the United Arab Emirates.

Key features of the Hatta hydroelectric power plant project

Situated on the slopes of the Hatta mountains, this power plant uses advanced technologies and solar energy to pump water from the lower reservoir to the upper reservoir. During peak demand, the stored water flows from a high point to a lower one and generates electricity by driving turbines. This system provides Dubai with a sustainable and efficient source of clean energy while also helping to balance the power grid.

Project objectives and benefits

Increase in the share of renewable energy: This project is one of the key steps towards achieving Dubai’s Clean Energy Strategy 2050, which aims to supply 100% of the city’s energy consumption from renewable sources by 2050.

Grid stabilisation and consumption optimisation: As a pumped-storage hydroelectric power plant, this facility is able to manage fluctuating electricity demand and ensure the stability of the power grid.

Reduction in carbon emissions and environmental protection: By replacing fossil fuels, this power plant makes a major contribution to reducing Dubai’s carbon footprint and achieving environmental goals.

Strengthening sustainable development in the Hatta area: This project will not only increase renewable energy capacity in the United Arab Emirates, but will also help economic growth in this mountainous area through job creation and the development of sustainable tourism in Hatta.

Part of Dubai’s sustainable future

The Hatta pumped-storage hydroelectric power plant, as a key achievement in the development of sustainable energy, will help shape a green and sustainable future for Dubai alongside other strategic DEWA projects, including the Mohammed bin Rashid Al Maktoum Solar Park. This project has been implemented in line with the development plans of the United Arab Emirates to reduce dependence on fossil fuels and achieve international environmental goals.

With the launch of this power plant in April 2025, Dubai will take an important step towards strengthening energy security, sustainable development and the use of new technologies to produce clean energy.

Source: Arabian Business

Buying Property in Dubai Is a Great Investment Opportunity. To Request a Consultation Call About Buying Property, Please Enter Your Name and Phone Number.